Dumaguete Info Search


Event NGCP advisory of scheduled power interruption on April 11, 2021 (Sunday)...

Discussion in 'NORECO II Announcements' started by NORECO II, Apr 1, 2021.

  1. NORECO II

    NORECO II Guest Guest User

    Ratings:
    +0 / 0
  2. charlyB

    charlyB DI Forum Adept

    Messages:
    430
    Trophy Points:
    191
    Ratings:
    +607 / 214
    12 HOURS ?? :arghh::arghh:
     
  3. Show Pony

    Show Pony DI Forum Patron Highly Rated Poster Showcase Reviewer

    Messages:
    1,283
    Trophy Points:
    356
    Ratings:
    +1,992 / 1,132
    They said they are replacing the REMAINING wooden poles. That sounds like there will be no more wooden poles.
    Yippee
     
  4. Notmyrealname

    Notmyrealname DI Forum Luminary Highly Rated Poster Showcase Reviewer

    Messages:
    3,869
    Trophy Points:
    341
    Ratings:
    +4,380 / 2,427
    HOLD YOUR HORSES (appropriately Mr PONY) .. they said they will "continue the replacement [of the wooden poles]".

    You got too excited too soon! But after a year of lockdown, anything is exciting! :smile:
     
    • Funny Funny x 2
    • Like Like x 1
  5. foobar

    foobar DI Member

    Messages:
    56
    Trophy Points:
    53
    Ratings:
    +57 / 3
    Business as usual. Where have you been the last few months?
     
  6. charlyB

    charlyB DI Forum Adept

    Messages:
    430
    Trophy Points:
    191
    Ratings:
    +607 / 214
    Where are you ?
    Around my area the power cuts for maintenance are usually 9 hours, 8am to 5pm, that is 9 right ? :confused:
     
  7. Edward K

    Edward K DI Senior Member Veteran Navy

    Messages:
    799
    Trophy Points:
    171
    Ratings:
    +831 / 75
    Can someone from noreco please answer:
    SERIOUS QUESTION FOR NORECO:
    All the towers for this 69kV are obviously big steel structures.
    WHY CANNOT YOU ISOLATE THE 69kV LINE FROM THE REMAINING WOODEN POLES, NONE OF WHICH, I THINK, CARRY A 69kV WIRE ?????
    WHY COULD YOU NOT INSTALL HEAVY DISCONNECT SWITCHES TO SAVE FREQUENT BLACKOUTS. ????
     
    • I was wondering about that too! I was wondering about that too! x 2
  8. Senjenbing

    Senjenbing DI Member Veteran Marines Navy

    Messages:
    98
    Trophy Points:
    66
    Location:
    Restaurant at the end of the Universe
    Ratings:
    +126 / 111
    The 69kV lines transmit down to the substation for onward transmission at 11/12kV. Each substation SHOULD have a HV disconnect - so why don't NORECO use them?
     
    • Thanks Thanks x 1
    • I was wondering about that too! I was wondering about that too! x 1
  9. foobar

    foobar DI Member

    Messages:
    56
    Trophy Points:
    53
    Ratings:
    +57 / 3
    Noreco is usually 8-5
    NGCP is usually 6-6
     
  10. Sedona

    Sedona DI Forum Adept

    Messages:
    308
    Trophy Points:
    161
    Ratings:
    +544 / 92
    I can answer the question from Mr. K ... It's because Noreco does not have one ounce of concern or consideration for the inconveniences caused to its customers.
     
    • Like Like x 1
    • Agree Agree x 1
Loading...