So, it is time to move on to the Eaves and Soffits. Now I have at least a 4+ metre high Roof Edge and buying wood is not really the option as there will be a lot of movement as they go along. I like to go for scaffolding that is safe ( well safer than wood which rots so quickly) Has anyone any Idea about equipment hire or even Purchasing of the Zipup type Scaffolding here in Dumaguete, Buying may be best as I am always going to need it in the future for any repair and maintenance projects. Any Ideas gays and Gals. JP
Jack, we have same prob here and need also,don't know the cell no but there is a woman opposite here who has similar scaffold and she charges p50 per section per day! She has enough to reach up that far.
OK So, Not having any real luck with the Zip Up Scaffold, My carpenter came up with a Double Decker system. A Wood Staging 8' x 3.' x 2.0 metre high Then Made another 7.6" x 2.6" x 2.0 metre High. The Larger one has Holding Blocks with Hasps and Wing Nuts( to Hold firm the Smaller one when Added, Good so now they can work at Ground Level, 2.0 metre high and 4.0 metre High. Problem Solved and is easily Moved when separated. Although it does take 3 men to assemble to Full height but...................It Works. JP
Jack...wish you would have told me you were going with wood. I sent a large truck load of wood to the village awhile back but still have more than that remaining that I need to get rid of. Shawn