Event NGCP advisory of scheduled power interruption on April 11, 2021 (Sunday)...

En tråd i 'NORECO II Announcements' startet av NORECO II, 1 Apr 2021.

  1. NORECO II

    NORECO II Guest Guest User

    Ratings:
    +0 / 0
  2. charlyB

    charlyB DI Forum Patron Highly Rated Poster

    Innlegg:
    1.081
    Poeng:
    341
    Ratings:
    +1.236 / 349
    12 HOURS ?? :arghh::arghh:
     
  3. Show Pony

    Show Pony DI Forum Patron Highly Rated Poster Showcase Reviewer

    Innlegg:
    1.666
    Poeng:
    371
    Ratings:
    +2.533 / 1.285
    They said they are replacing the REMAINING wooden poles. That sounds like there will be no more wooden poles.
    Yippee
     
  4. Notmyrealname

    Notmyrealname DI Forum Luminary Highly Rated Poster Showcase Reviewer

    Innlegg:
    5.139
    Poeng:
    451
    Ratings:
    +5.819 / 2.942
    HOLD YOUR HORSES (appropriately Mr PONY) .. they said they will "continue the replacement [of the wooden poles]".

    You got too excited too soon! But after a year of lockdown, anything is exciting! :smile:
     
    • Funny Funny x 2
    • Like Like x 1
  5. foobar

    foobar DI Member

    Innlegg:
    60
    Poeng:
    53
    Ratings:
    +64 / 5
    Business as usual. Where have you been the last few months?
     
  6. charlyB

    charlyB DI Forum Patron Highly Rated Poster

    Innlegg:
    1.081
    Poeng:
    341
    Ratings:
    +1.236 / 349
    Where are you ?
    Around my area the power cuts for maintenance are usually 9 hours, 8am to 5pm, that is 9 right ? :confused:
     
  7. Edward K

    Edward K DI Senior Member Veteran Navy

    Innlegg:
    924
    Poeng:
    251
    Ratings:
    +997 / 82
    Can someone from noreco please answer:
    SERIOUS QUESTION FOR NORECO:
    All the towers for this 69kV are obviously big steel structures.
    WHY CANNOT YOU ISOLATE THE 69kV LINE FROM THE REMAINING WOODEN POLES, NONE OF WHICH, I THINK, CARRY A 69kV WIRE ?????
    WHY COULD YOU NOT INSTALL HEAVY DISCONNECT SWITCHES TO SAVE FREQUENT BLACKOUTS. ????
     
    • I was wondering about that too! I was wondering about that too! x 2
  8. Senjenbing

    Senjenbing DI Forum Adept Veteran Marines Navy

    Innlegg:
    419
    Poeng:
    186
    Sted:
    Milliways - at the end of time and matter
    Ratings:
    +558 / 211
    The 69kV lines transmit down to the substation for onward transmission at 11/12kV. Each substation SHOULD have a HV disconnect - so why don't NORECO use them?
     
    • Thanks Thanks x 1
    • I was wondering about that too! I was wondering about that too! x 1
  9. foobar

    foobar DI Member

    Innlegg:
    60
    Poeng:
    53
    Ratings:
    +64 / 5
    Noreco is usually 8-5
    NGCP is usually 6-6
     
  10. Sedona

    Sedona DI Forum Adept

    Innlegg:
    384
    Poeng:
    206
    Ratings:
    +673 / 102
    I can answer the question from Mr. K ... It's because Noreco does not have one ounce of concern or consideration for the inconveniences caused to its customers.
     