I am a master electrician house is being wired to US standards each appliance has its own circuit refrigerator. microwave,hot water, all 3 A/C units, 2 lighting circuits, 2 GFCI circuits ( dirty kitchen,3 counter top. CR, outside outlets,) transformer and convenience recpts and drive way lights
Best Posts in Thread: Our Valencia guest house build
Page 2 of 2
-
Just a little. Update finish is going on the walls most of the electrical is done. trusses are getting welded again notice the feet welding with flip flops. floors are being tamped should be getting poured in the next week
-
Like x 1
-
Thanks x 1
-
-
Things are starting to come together the backfill is getting delivered columns poured ready for window and door beams to be poured then 2 more course of block and tie beam
[DOUBLEPOST=1432422170,1432422006][/DOUBLEPOST]on the lighter side for a bit
My honey was cutting the grass at the lot while I was enjoying a coconut when a old woman was passing through the jungle and she yelled at me "you should be hung having your wife cut the grass like that" I told her she should buy a lottery ticket because she was good at guessing
-
Thanks x 2
-
-
we started the project last Tuesday so we are already a week into it at this time we have downed 11 coconut trees and have had them cut into lumber for the project. we have had the material shed build and and most of the materials on site after doing a lot of canvasing of venders for price and quality. my wife and a lot of her family have many contacts in the area this has helped a great deal. so these pics are of the progress of 6 days work.
-
Informative x 2
-
-
Hello Me and my honey are are building a small guest house on our lot in Valencia. We hope you enjoy the posts we will do our best to keep you updated,
-
Informative x 2
-
Page 2 of 2